GeneralGovernment SchemesLatest News

PM Gati Shakti, 2024

PM Gati Shakti

PM Gati Shakti, often called the National Master Plan for Multi-modal Connectivity (IAST Pradhānmantrī Gatī Shaktī), is an ambitious infrastructure project in India that has undergone careful preparation. India’s $1.2 trillion PM Gati Shakti plan aims to boost the country’s manufacturing competitiveness.

A GIS-enabled platform that aggregates data from railroads, ports, roadways, and other infrastructure onto a single platform is one of the plan’s characteristics. This allows for the detailed organisation of multimodal logistics.

Furthermore, the plan consists of:

Arrangement of plans

This plan unites 16 ministries, including roads and railways, with the purpose of integrated planning and coordinated implementation of infrastructure connectivity projects.

Tools for analysis

Over 200 layers of analytical tools are included in the plan to provide greater visibility to the executing agency.

images from satellites

The proposal offers satellite imagery that refreshes the portal with project status updates on a daily basis and provides periodic updates on on-ground activity. This aids in figuring out the essential actions to improve and update the master plan.

When was the was the PM Gati Shakti Scheme launched?

The Pradhan Mantri Gati Shakti (PMGS) Plan was introduced by Prime Minister Modi on October 13, 2021, with the goal of dismantling interministerial silos and integrating infrastructure project planning.

How is the PM Gati Shakti scheme implemented?

According to the guidelines outlined in the Gati Shakti master plan, major infrastructure projects, including Bharatmala, Sagarmala, UDAAN, the development of the railway network, inland waterways, and Bharat Net, will now be implemented.

Millions of jobs are also anticipated to be created as a result of the Gati Shakti masterplan, which aims to achieve three main goals: smooth multimodal connectivity to make it easier for people and goods to move around; better prioritisation, efficient resource use, and prompt capacity building; and resolution of problems like inconsistent planning, standardisation, and clearances. 

What are the key objectives of the PM Gati Shakti scheme?

A ground-breaking programme, the PM Gati Shakti scheme would simplify easier planning, reduce overall implementation costs, and allow for cooperation across many ministries, states, and departments. Vipula Sharma, senior director of ratings at Brickwork Ratings (BWR), states that although there may be some early platform constraints, once they are resolved, this approach has the potential to revolutionise the infrastructure development industry.

What are the plan goals of the PM Gati Shakti scheme?

The different goals that the Gati Shakti plan aims to accomplish are mentioned below:

  • The national highway network will expand the capacity of the roads to reach the 2 lakh km milestone.
  • Around 200 additional airports, heliports, and water aerodromes are planned as part of the plan, which will greatly expand aviation.
  • Railways will be able to carry approximately 1,600 metric tonnes of goods by FY25.
  • simplicity of availability of electricity with a 454,200-circuit-kilometre transmission network
  • By FY25, renewable capacity is expected to reach 225 GW.
  • An additional 17,000 km of gas pipes are scheduled for completion in the same year.
  • By FY22, the villages will have 4G connectivity.

What is PM Gati Shakti?

The goal of PM Gati Shakti is to expedite infrastructure development by combining various government programmes and plans. It achieves an all-encompassing approach to infrastructure development by utilising information, technology, and innovation.
 

What are the benefits of PM Gati Shakti?

In addition to speeding up approvals and enabling almost real-time application tracking, PM Gati Shakti can save the cost and time required to obtain permissions from numerous ministries and departments. It also views infrastructure development as a comprehensive and all-encompassing process, helping to prevent conflicts by promptly resolving difficult issues.

What challenges does PM Gati Shakti face?

Lack of departmental cooperation, unnecessary spending, protracted approval processes, multiple regulatory approvals, hostile land acquisitions, and issues obtaining environmental clearance are a few of the difficulties.



Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!